contruction project

200+ core renovations

Brief description

More than 200 residential units in the Spandauer Siedlung were due for refurbishment. The difficulty with this order was expressed in two points: To deliver reinforced concrete core refurbishment in a short period of time in a quality manner. Here, too, we excelled ourselves and managed to deliver more than 16 residential units per month. Thus we were in under 12 months through with this project. Sustainable, efficient and on time.

Location description

The wonderfully located Angeburger Allee has several entrances and exits, elevators and barrier-free options. Many public connections to the public transport network (ÖVNP) can be reached quickly and the city freeway is also nearby.

Contact us now for your construction project and let us convince you of our competence and expertise.

Powered by Nawaf Awada.

Sites
office

Spreetalallee 1, 14050
Berlin Charlottenburg
Germany

Edit Content
Environmental Measures

Sustainablity trough Innovation

We drive innovation at all levels of project development, design and construction. One focus of our efforts is our energy design for renovations and plant engineering.

Climate-friendly energy solutions:
  • green power from sun, wind and hydropower at the site of eco-providers
  • photovoltaic projects: Integration into roof surfaces and facades
  • electrification of heat generation and avoidance of fossil fuels
  • Maximized use of available environmental energies, such as geothermal or groundwater energy, for the benefit of climate-friendly heating and cooling supply
Sustainable materials:
  • use of ecological building materials with low levels of pollutants and trace gases.
  • preferential use of natural and recyclable building materials and constructions
digital planning
  • digital control and the use of algorithms make the construction process faster, more efficient and thus also more sustainable and cost-effective
  • prevention of overproduction, misdeliveries and waste
  • savings in construction material due to reduced component thicknesses with prefabrication
  • use of recycled precast concrete elements
Contact

very easy just Contact us

head quarter

Spreetalallee 1, 14050 Berlin Charlottenburg, Germany

business hours

Monday - Friday

9am to 7 pm.