Projektentwicklung

health care club murnau Bayern

Brief description

Together with Dr. Arth and the town of Murnau, a health center of over 5,000 square meters is to be developed by the MFN Group by the end of 2024. The center will include high-quality apartments for guests, an indoor swimming pool, several commercial areas, green spaces, and several medical practices and medical centers. In the foreground of the project planning is the ConceptGreenFuture, which guarantees sustainability. 

Location description

Murnau is located in the foothills of the Bavarian Alps about 70 km south of Munich. From the village you can see the peaks and ridges of the Ammergau Alps from the Hörnle. The landscape is very varied. There are many lakes and mountains. So, by German standards, it is the ideal place for a health vacation to regenerate. 

Voriger
Nächster

all projects







    info@mfn-ab.de

    Contact us now for your construction project and let us convince you of our competence and expertise.

    Powered by Nawaf Awada.

    Sites
    office

    Spreetalallee 1, 14050
    Berlin Charlottenburg
    Germany







    Edit

    Environmental Measures

    Nachhaltigkeit durch Innovation

    We drive innovation at all levels of project development, design and construction. One focus of our efforts is our energy design for renovations and plant engineering.

    Climate-friendly energy solutions:
    • green power from sun, wind and hydropower at the site of eco-providers
    • photovoltaic projects: Integration into roof surfaces and facades
    • electrification of heat generation and avoidance of fossil fuels
    • Maximized use of available environmental energies, such as geothermal or groundwater energy, for the benefit of climate-friendly heating and cooling supply
    Sustainable materials:
    • use of ecological building materials with low levels of pollutants and trace gases.
    • preferential use of natural and recyclable building materials and constructions
    digital planning
    • digital control and the use of algorithms make the construction process faster, more efficient and thus also more sustainable and cost-effective
    • prevention of overproduction, misdeliveries and waste
    • savings in construction material due to reduced component thicknesses with prefabrication
    • use of recycled precast concrete elements
    Contact

    Ganz einfach in Kontakt treten

    head quarter

    Spreetalallee 1, 14050 Berlin Charlottenburg, Germany

    business hours

    Monday - Friday

    9am to 7 pm.

    Connect